How much is he asking? Plan on doing the valve stems within the next 15-20k and since it all has to come apart it?s a good time to reseal the engine and re do the timing (belts, tensioner ect(also inspect the lower intake and maybe buy the updated assembly)) even though it?s timing has been done it will be cheaper to knock all this out at once and not worry about it for a long time.
The other hand you could just keep putting oil in it <img src="/forums/images/graemlins/smile.gif" alt="" />


1999 Montero SAS'd on Kings and stuff

1998 Montero trying to get a V8 Swapped