I think if adam needs us to move it locations then maybe we should move it. This way he can keep moving on the fab work while the engine is getting its proper preparation. We also need to get that front axle out and get that ARB installed.

When I replace the lower plenum, I'm just installing it as is. The butterfly valves are eliminated and should keep any issues out of the way. If lloyd decides to pay out the cash for the updated plenum later down the road then it will benifit him but for now, we can roll the way it is.

I'm also not real sure whats up with the transfer case. I helped pat remove the speedo deal from the tail housing but I'm not real sure what else needs to be done to it. I'm sure we need to make a parts run to the junk yard for some miscellaneous items for it maybe.

Don't worry Lloyd everything is under control <img src="/forums/images/graemlins/kewl.gif" alt="" />


!!!!!!!!!!!!!WHAT ABOUT BOB!!!!!!!!!!!!!!!