diffs are out and getting the bearings pulled/repressed on with arb locker and 4.90s gotta do close to the same for the rear. We got the gps speedo install finalized once diffs are back in we'll take a spin and see how close it reads. compressor install is about 50% we gotta mount the tank and that gauge with the switch along with the valving\hose for the arb and tank. toasty has some more welding to do so its coming along i think the compressor stuff is gonna be the next biggest project which really isn't bad but i think it may end up taking a good part of a day to do. i'm not sure what all adam has finish up but i think thats the last stop after we get all the other stuff buttoned up.


89 2 dr turbo diesel
89/88 "Backwoods sas"