</font><blockquote><font size="1" face="Verdana, Tahoma, Arial, Helv, Helvetica, Sans">quote:</font><hr /><font size="2" face="Verdana, Tahoma, Arial, Helv, Helvetica, Sans">Originally posted by BobG:
<strong>I'm planning getting a 12 x 24 shed to put a mill and lathe into real soon and plan to paint the slab before the shed goes up. </strong></font><hr /></blockquote><font size="2" face="Verdana, Tahoma, Arial, Helv, Helvetica, Sans">Make sure that slab is DEEP, I would suggest at least 12" to preclude any weird finishes on alloys when machining. The planned 2nd garage on the wife's new house (it ain't mine, I only get the garage) is 18" thick, full slab, tied seperately from the rest of the slab. Looking for the right Matsuura CNC and in it goes...

Mike