If you want to drive at high speed in 4WD or at least with the front hubs locked, run a CV shaft, otehrwise u-joints are fine for a trail rig. Send the old shaft off to High Angle Driveline, Jesse can open up the CV and put a long slip yoke on it and it'll run about $300. New CV shaft will be in the $400+ range. New CV joints are expensive.