So I talked to Mike at ORS about a front driveshaft and the numbers he is giving me are much higher than are posted here. He said that it would be in the $350 range and that I would have to have an '85 core. Yota Yard sells the '85 shafts for $125 without a core, so that puts me at $475 for a rebuilt shaft. That is just way too rich for my blood. It was a stretch for me to pay for the crossover steering at $400 and now with the FROR pitman I am at $535 plus shipping for the crossover kit.

Has anyone used the driveshaft kit from Marlin

http://www.marlincrawler.com/shaft.html

or Allpro?

http://www.allprooffroad.com/driveline.html

It is $189 plus shipping. I would hope that it would be cheaper if I did my own work on the cv joint

http://www.4x4wire.com/toyota/tech/cvmod/

then I might be able to get it done for less than $300. I am curious if anyone has used this kit. Is it easy to do yourself? I assume that once you cut off the stock slip joint and weld the new slip joint on then all you need to do is have it balanced. I am so frustrated by paying this shop to put my crossover steering on without even checking to see if the pitman arm would clear the tie rod that I am bound and determined to do my own work from now on.

Chris Sutton
Golden, Colorado


1985 Toyota 4Runner - Longfields, 5.29's, EZ Locker F/R, Marlin X-Over, Rancho 99012's, 35" BFG AT KO, 414K miles.
1996 FZJ80 stock with 191K miles.
1980 FJ40 stock with 85K original miles.