You forgot the customary :

-drink a beer

after each of those steps. So my typical list would look like this.....

-drink a beer
-unhook and label wires/lines
-drink a beer
-remove head
-drink a beer
-get head inspected for warping and have it machined as necassary
-drink a beer
-place gasket as well as some squeezable gasket sealer
-drink a beer
-finger tighten bolts back on
-drink a beer
-torque the 10 bolts to 58 ft lbs in correct order
-drink a beer
-reconnect wires
-drink a beer
-take dogs to park.
-drink a beer

PS. I Have someone else test drive so I dont get a DUI


Michael J. Carsner proud driver of "Aint Pretty"

37 boggers, 571 gears, Detroit+Lock-Rights, 20R stage 1 LC Engineering head on 22R motor.
MUD!!! Its whats for dinner!!