well mike this is what i did I cut at the window line,so there would be alot less sheet meyal filling just around the corner at the rear and small fill from the top front corner of the window to the roof.Then folded over the window edges as flat as possible.Same on the tailgate.Then rhinolined the area of work for finished look.Works awsome looks pretty good. Tops,hardtop alot of work so i scrapped the idea.Fast back no windows just for know15 bucks for material 20 bucks for snaps and install tool.Actual conv. top $300 to$350,actual quote from local upolstery shop I build the bows "easy" hardware for bows $20 from local boat shop.bows $10 for piece of EMT tubing borrow a bender from somebody and go for broke..GOOD LUCK..WILL POST PICKS AS SOON AS I FIGURE OUT DIG. CAMERA DEAL.... <img src="/forums/images/graemlins/kewl.gif" alt="" />


85 monty swb,full 4.3swap,5spman&hd231tcase,34"swampers,dualbouncy, softop done,new tbars,S10 rear spring w/dual shackles.