Well, as of yesterday I had pretty much given up on taking this thing with me to EJS. I leave a week from this friday, and I still have a ton of work to do. Today a couple friends decided to change my mind though. They offered to help me get this thing running in time so that we could test it out in moab. It definitely wont be finished, but hopefully it will be running. Me and Josh worked until midnight tonight and got quite a bit done. He worked on mounting the radiator and fan while I got to work on some of the remaining tube work. I finally sat down and figured out the roof line and bent up the first tube. Unfortunately I didn't have enough long pieces of tube to bend the other side though.

[Linked Image]

While I was working on fitting tubes, Josh was making a bunch of brackets. The fan and Radiator are in place now, with enough space behind them for my winch. I'm not going to put the winch up front both for better weight distribution, and so that the cable can drop straight down to the axle for suspension control.

[Linked Image]

Heres one more of the fan and brackets Josh made.
[Linked Image]


Dallas


[color:"blue"]Crew Chief, RedBull RockCrawling Team [/color]

[color:"red"]StinkyFab Custom Metal Creations[/color]

Project StinkBug