the axle is all done. it is completely assembled, bolted on with tires mounted and sitting on the ground. i need to now order my tie rod and drag link. then i can order my driveshaft. these were things i needed to measure for after the axle went in. i have the rockstomper setup for the new chevy master cylinder that i need to bolt up and then bleed the brakes. weld on some shock mounts and bolt those on. those are all fairly simple tasks.


Scott Landon
1995 T100 - total buildup underway
1988 4Runner (22RE, W56) - new DD
2005 Dodge CTD 4x4 - Tow Beast
1990 Spec Miata
2010 GT3
2013 E92 M3