I managed to re-route the TV cable and get everything to fit.

This piece is made from a piece of 16 ga steel
[Linked Image]

and mounted on the throttle body
[Linked Image]

Everything painted up and re-installed
[Linked Image]

Here is the clearanced tranny pan installed
[Linked Image]

I got the cooling system sealed and topped off, and the T-case is full. The only real thing left to do is the dip stick. I creased up the universal one I picked up trying to negotiate it into shape <img src="/forums/images/graemlins/scared.gif" alt="" />. I found a flexible one that mounts to the firewall that should do the trick.

I bought some steel rod to splice and extend the stock shifter linkage, and that should do it.

<img src="/forums/images/graemlins/cheers.gif" alt="" />Andre


"SERENITY NOW!"

1995 Passport - TH700R4 - Twin-sticked Dana300 w/tera 4:1 - Leaf sprung SAS w/Dana 60/14BFF - 38.5x11 Boggers - DOR bumper w/ MM SE9500