1.5" tubing welded inside frame rail with some plating at the ends to distribute the load across the frame surface, 1/2" ID tube for the upper mounts welded through the tubing, lower mounts i would just order some prefabbed shock tabs, weld those on top of housing, w/ ubolt flip youll have to do some kind of custom bumpe stop...

Issues youll run into is all the brake lines with proportion valve is right there in the way on inside frame rail...


97 FZJ80, Stock, Factory Lockers.