I guess it is really the mentality that I CAN do just about anything. I mentally prepare for things like motor swaps, and SAS, and big projects, and make sure all the research is done beforehand. With something like ordering shocks, all you really have to do is take some simple measurements, and order them. Should take like 15-20 mins total time.

Just one of those things I guess. <img src="/forums/images/graemlins/kewl.gif" alt="" />

I need an apprentice.


87 Raider 4D56td v5MT1
31's..Basically Stock