I have done lots of them; not too bad of a job, if you have the tools and experiance. You can knock the job out in around 6 hours or so if you have everything prepped and all the parts ready to go.

Take your time and be sure to use a torque wrench and the proper torque sequence. Also triple check the timing marks when you line it all back up.


John Luttrell
2001 4x4 short cab, 3 inch lift with 33 inch mudders and Powertrax no-slip in the rear


1991 Jeep YJ, 4 inch suspension lift on 33" BFG's